MTTC FLEET PROJECTS
COST AVOIDANCE
The Goal of the Fleet Maintenance Reduction Program is to provide significant cost reduction and improved readiness for the fleet.
|
FLEET MAINTENANCE REDUCTION PROJECT
|
COST AVOIDANCE
|
|
ANNUAL
(recurring)
|
15-YEAR
|
CVN ELEVATOR ROLLERS
|
$ 1,500,000 |
$ 22,500,000
|
ANTI-SWEAT PAINT
|
$ 30,000 |
$ 450,000
|
COMPOSITE CONNECTORS
|
$ 100,000 |
$ 1,500,000
|
BLADE COATING
|
$ 1,400,000 |
$ 21,000,000
|
SUPERBOLT
|
$ 975,000 |
$ 14,625,000
|
PORTABLE CHLORINATOR | $ 500,000 | $ 7,500,000 | WATERTIGHT DOOR HINGES | $10,000,000 | $150,000,000 | HEAT EXCHANGE DESCALER | $ 4,000,000 | $ 60,000,000 | EPOXY BILGE PAINT | $ 6,000,000 | $ 90,000,000 | CONNECTOR COVERS | $ 250,000 | $ 3,750,000 | K-FLEX ECO INSULATION | | | ECOTHERM PIPE INSULATION | $ 1,250,000 | $ 18,750,000 | DDG-51 LOUVERS | $ 700,000 | $ 10,500,000 | REMOTE VALVE ACTUATORS | $ 305,000 | $ 4,575,000 | DISTILLER ANTI-SCALE | $ 398,000 | $ 5,970,000 | STRATICA DECK TILE | $ 1,648,000 | $ 24,720,000 | BOAT DAVITS | $ 1,950,000 | $ 29,250,000 | VERTICAL PACKAGE CONVEYOR | $ 2,100,000 | $ 31,500,000 | CIWS CAM PIN | $ 224,000 | $ 3,360,000 | SPEEDWRAP INSULATION | $ 2,500,000 | $ 37,500,000 | HYDRAULIC RAM REPAIR | $ 900,000 | $ 13,500,000 | VARIABLE SPEED DRIVE | $ 7,016,000 | $ 105,240,000 | MAGNETIC COUPLINGS | $ 6,260,000 | $ 93,900,000 | SCULLERY DISHWASHER | $ 1,515,000 | $ 22,725,000 | UNREP PHONE/DISTANCE LINE | -- | -- | VIBRACON SHOCK | $3,150,000 | $ 47,250,000 | DDG IFFCS VALVE ACTUATOR | $ 250,000 | $3,750,000 | FIREZONE JOINER DOORS | $ 2,040,000 | $ 30,600,000 | GAS HATCH SPRING | 0 | 0 | SELF CLEANING STRAINER | $ 4,080,000 | $ 61,200,000 | TOTAL COST AVOIDANCE | $61,041,000 | $915,615,000 | |