Fleet Maintenance Reduction Program

VPC Chain Tensioner System

Status:  Complete/Did Not Meet Requirements
Estimated Navy Cost Avoidance:
Minimum annual:   $ 1,700 K
Minimum 15 Year:   $ 25,500 K

Fleet Maintenance Project Image

This project has been completed. Test site testing was completed (Phase I). During this testing, it was determined that the size of the controller required would prevent any fleet-wide installation. In addition, the previous VPC project has been so successful that this additional feature is probably moot. Therefore, Phase II has been cancelled.
Problem:
The Vertical Package Conveyors have long been a maintenance and repair-intensive system. If the chain tensions and positions are not properly aligned, significant jamming and component damage will occur.

Solution:
MTTC, with NSWC/CD/Philadelphia will leverage off the PLC added during the previous VPC project to adapt a commercial automated chain tensioner that will constantly monitor and adjust the tensions of all four of the chains.

Fleet Impact:
Successful accomplishment of this project will eliminate the most significant maintenance issue involving this equipment. It will save significant repair and man-hour costs.

Applications:
All Aircraft Carriers; Surface Combatants with vertical package conveyors.


Navy POC:  Don Neuman, NAVSEA-05P8  •  Phone:  (202) 781-3701
Innovative Productivity, Inc. (IPI) operates Healthy Hospital, the McConnell Technology & Training Center
and the National Surface Treatment Center for the US Navy.
Naval Surface Warfare Center, Carderock Division manages the contract with Innovative Productivity, Inc. (IPI)